200 EAST 63RD STREET BUILDING

In 2007, the Second Avenue Subway resumed construction. As part of the project, the 63rd street station was to undergo renovation to finish the BMT side, which would serve Second Avenue Line trains. Due to the station construction several existing buildings need to be retrofitted to provide entrance/exit facilities. 200 East 63rd Street is one such building that needed partial removal of existing foundation and installation of pile foundation. All this was completed while the building was occupied. 

J16
J21
J6
J3
J4
J5
J20
J19
J18
J17
J14
J13
J12
J11
J10
J2

Credits

General Contractor:
JUDLAU CONTRACTING

Hayyan Design's Scope
Quality control of piling work, structural steel work, underpinning
foundation and utility relocation